Key words

  • Injection pressure

  • Number of molds and the number of cavities

  • Setup time for switching components or molds

  • Bulk production

  • Requirement calculation: scrap and yield

 

The mold injection manufacturers are faced with various problems and tasks.

  • Work instructions are required to consider the number of molds and facilities as well as the injection pressure.
  • Plans need to be changed, considering the maintenances or failures of molds.
  • Workers need to be correctly assigned based on the changeovers of parts or molds.
  • The rate of yield or the number of scraps should be counted to purchase the correct amounts of raw materials.

We will describe how to solve these problems with scheduler.

Video List (30min total)
 
64.01 Master data registration and scheduling of production process for injection-molded items   Video
 
64.02 Equipment constraint 1 – Injection molding machine assignment based on injection pressure   Video
 
64.03 Constraint 2 – Number of molds and number of cavities   Video
 
64.04 Reflecting operation results in the schedule and replying with the delivery dates for rush orders   Video
 
64.05 Molded part and mold switching setup   Video
 
64.06 Bulk production and safety stock based on lot size   Video
 
64.07 Requirement calculation (scrap and yield) and purchase plan   Video
 

Here if you would like to see on Youtube.