Q: How can we calculate KPI and equipment load from annual sales plans?

A: Schedule by inputting a one-year sales plan (value of estimated demand) refer to the calendar and then divide the monthly demand quantities into daily demand quantities. The input processing and output for long-term scheduling is almost the same as for mid-term scheduling. From the results of the schedule is calculated the order KPI for each order and the time KPI for the period specified for the entire plant.

036

Related articles : 

Birth of the Advanced Planning and Scheduling System (APS)

Visualizing KPI

Visualizing Individual Costs