Information about a resource that describes the way it is used in a given process. The instruction is entered in the Integrated Master.
Use instructions record the production equipment (referred to as main resource) operators, process tooling and molds (referred to as sub resources).
Enter the resource's manufacturing capacity, setup time, and so on.
In addition, assignment priorities and combinations of main and sub resources can be specified. For example, if a particular mold produces fewer rejects, it would be given a higher assignment priority for use in the process.

 

See also "Integrated Master" in Online Help.