Results


In Asprova APS, it is possible to input reported results to scheduled operations and create a new schedule taking into account, the results you input. Usually, you can enter results data from the following:

Operation Table

  • You can specify results data directly in the related properties such as "Status" and "Reported start time".

Results Table

  • You can specify results data by specifying an operation code and task index.
  • You can specify multiple result records for the same operation or task. In that case, the most recent result record will be used.
  • When you want to specify task results from the results table, you need to map the property "Task index" from the DBIO object of the results table. For "Task index", set "1" for setup tasks, "2" for production tasks, and "3" for teardown tasks as in the task master table. When no value is set as a task index, the results will be regarded to be of an operation. (Importing/exporting task results using the results table is a Ver.4 restricted feature.)

As for determining the most recent result record, please refer to the topic "Determining whether results data is the most recent" of the Results data reflection rule in the help file.

Task Table

  • You can specify results data directly in the related properties such as "Status" and "Reported start time".

Order Table

  • You can specify results data using the properties "Status" and "Operation results" of the order class.
    In addition, "Result obtained time", "Result start time", "Result progress" and "Reported qty" can be set in Asprova SCP module.


HelpNo.:783000
©Since 1994 Asprova Corporation, All rights reserved.