Status

Status


"Status" represents what state an operation is in. The following values are for the status flag:

Unscheduled

Never been scheduled before.

Scheduled

Has already been scheduled.

Released

Similar to operations that are fully fixed, the released operations will not be moved from the currently assigned resources, even if you execute rescheduling. The differences compared to a fully fixed operation are:
If a released operation has a time constraint violation with the previous process, then the operation will be reassigned to another time that does not violate the time constraint during rescheduling. If the [Results entry flag] property of a resource is specified as "Not mandatory", Asprova will try to assign to a time period that may even be earlier than [Assignment start time]. (If the [Results entry flag] property of a resource is specified as "Mandatory", the operation will be assigned to a time period after [Assignment start time])

Frozen

Frozen operations are assigned backward at infinite capacity. Even if they are assigned before the scheduling start time or if there is no working time with the resource, they are immovable and will not be moved from the assigned time and resource. If you change the capacity or production factor or production quantity in the master data, the production time of the operations will not be changed even when you reschedule.

Started

This operation has been started but not yet completed, and displays results so far. Started operations are assigned backward at infinite capacity, taking into account the results data. If you change the capacity or production factor or production quantity in the master data, the production time of the operations will change, when you reschedule it.

Completed

This operation has been completed and displays results. Completed operations are assigned backward at infinite capacity taking into account the results data. If the [Reported start time] and [Reported end time] are not specified for completed operations, and you change the capacity or production factor or production quantity in the master data, the production time of the operations will change when you reschedule it.

For more information about "results", refer here.


HelpNo.:755000