Body part popup menu

Load Graph

The body part popup menu of a load graph is a popup menu that is displayed by right-clicking the mouse on the body part (cells of the time chart) of a load graph.

The body part popup menu provides the following items:

Drill down

Order

Displays order rows of operations in the selected cell.
Clicking on the minus (-) button displayed in the left part of the drilled down row will close the drilldown display.

Operation

Displays operation rows of operations in the selected cell.
Clicking on the minus (-) button displayed in the left part of the drilled down row will close the drilldown display.

Inventory graph (Input Item)

Displays an inventory graph of input instruction items of operations related to the selected cell.
Clicking on the minus (-) button displayed in the left part of the drilled down row will close the drilldown display.

Inventory graph (Output Item)

Displays an inventory graph of output instruction items of operations related to the selected cell.
Clicking on the minus (-) button displayed in the left part of the drilled down row will close the drilldown display.

Order Filter Expression

Edit the filter expression for filtering drilldown rows’ orders.

Operation Filter expression

Edit the filter expression for filtering drilldown rows’ operations.


Label

Adds Label.


Zoom to selected cells

Enlarges selected cell area.

Steps

  1. Select a cell(s) you want to zoom and click the right mouse button.
    The body part popup menu is displayed.
  2. Select [Zoom to selected cells] from the body part popup menu.
    The selected cell area is enlarged.

Add Overwrite Calendar

Adds the overwrite calendar for the selected time span.

Add Overwrite Calendar

Adds the overwrite calendar for the selected time span.

Working Patten Settings

Displays the working pattern settings dialog.

Jump

Jump to the calendar or shift table used in the selected period and edit it directly.

Copy Shift

Copy the shift codes. The shift codes can be pasted in a text editor or Excel.

Paste Shift--Shift Only

Paste only the shift.

Paste Shift--Shift and Resource Quantity

Paste only the shift and resource quantity.

Paste Shift--Resource Quantity Only

Paste only the resource quantity.

Delete shift

Displays in the sub menu the shift from the calendar record that the selected cell fully includes.
If you select the shift from the sub menu, the corresponding calendar record will be deleted.
You will not be able to select the menu unless there is a calendar record that is fully included in the selected cell.

Set shift for day of week

Choose whether to select from the registered shift codes or to apply the change in the calendar made by using the working pattern settings dialog to days of the week.
If this menu is checked, the selected shift or working pattern will apply to days of the week. If not, they will apply to the selected cell.
A check mark is placed by selecting this menu; it is removed by selecting the menu again.

Set Shift for Day of Month

Choose whether to select from the registered shift codes or to apply the change in the calendar made by using the working pattern settings dialog to days of the month.
If this menu is checked, the selected shift or working pattern will apply to days of the month. If not, they will apply to the selected cell.
A check mark is placed by selecting this menu; it is removed by selecting the menu again.

Registered shift code

A list of shift codes specified in the shift table is displayed. If you select one of the shifts from the list, working time of the selected cells will change to that shift.


About the calendar settings in the load graph, please read here.



HelpNo.:693000
© Since 2019 Asprova Corporation, All rights reserved.