The Resource gantt chart is a table time chart whose table view displays resources.
This chart enables you to understand how operations are assigned to each resource.

Working time

The gray portions of the Resource gantt chart represents the Working Time of a resource.

 

Use Instruction Bar

When you reschedule, scheduling results are displayed on the Resource gantt chart by use instruction bars as a series of tasks for each resource.
On the use instruction bars, you can display information related to corresponding operations. This character string is called a "use instruction bar text expression". Depending on the settings of the use instruction bar text expression, you can display different information on the use instruction bars.

When the mouse is held above a use instruction bar, a tooltip displaying more information is shown.

The tooltip and status bar text can be customized.

Use instruction bars on the Gantt chart can be searched using Resource Gantt Search dialog.

 

Suspend time display method

When use instructions stretch across periods of time where there is no working time, the appearance of this suspended time can be changed with the [Suspend time display method] under the Bar tab)

 (This feature was introduced from Version 6.2.2. Previously it had been "Underline").

 

Options

Overview

 

Underline

The suspended time portion is shown as a thin line at the bottom of the bar

 

Center

The suspended time portion is shown as a thin line at the center of the bar

 

Thick

The suspended time portion is shown as a thick line at the center of the bar.

 

None

The suspended time portion is shown in the same way as the rest of the bar.


 

Left part text expression

Resources are shown on the left side of Resource gantt chart (vertical axis).
Via [Resource left part text expression] property found in chart display settings (table tab), the contents of the information shown on left can be customized.
The above mentioned property setting is reflected on other charts such as Operation chart and Pegged order chart as well.

<Example>Code + name
Me+"\n "+ Me.Name

 

Background color expression on the left part (Ver.8 restricted feature)

The color of the left part of Resource gantt chart can be set via the [Resource left part color expression] in the "Chart display settings", under the table tab.

The above mentioned property setting is reflected on other charts such as Operation chart and Pegged order chart as well.
Before Version 7.3.1, the color can be changed.

<Example>Color of resource group
Res_Group[1].Res_Color

 

 

Status

Depending on the status of an operation or task, the following markers are displayed under the bar:

Results

The use instruction bar appears shaded and a gray line is displayed under the Use instruction bar.

Frozen

A black line is displayed under the Use instruction bar.

Released

A green line is displayed under the Use instruction bar.

 

Fix

You can fix time or resources for each use instruction and operation. Depending on the method of fix, each fix is displayed differently as follows:

Full fix

Blue L-shaped markers are displayed under the Use instruction bar.

Time fix

Blue vertical markers are displayed under the Use instruction bar.

Resource fix

Blue horizontal markers are displayed under the Use instruction bar.

Use instruction fix

Red horizontal markers are displayed under the Use instruction bar.

 

Bar Color

A use instruction bar is displayed in the color specified for the Bar Color Method property of the resource Gantt chart display settings.

 

Connection Lines

Connection lines represent relationships between operations.

 

Warning display

As a result of scheduling, assigned operations may violate various constraints. The resource Gantt chart displays a warning for violation of constraints for the following:

Latest end time violation (lateness)

If an assigned operation runs late, the task string is displayed in red and a red check mark is shown on the lower right-hand corner of the operation.

Earliest start time violation

If an operation has been assigned before the earliest start time, the task string is displayed in blue.

Resource quantity violation

A red line is displayed under the Use instruction bar.

Forcibly assign

A red line is displayed under the Use instruction bar.

Time constraint violation

If the time relationship between processes violates time constraints (the relationship is reversed), the connecting lines will be displayed in red.

Time constraint MAX violation

If the time constraint MAX is violated, the text and connection lines will be displayed in orange.

 

Status bar text

On the status bar of the Resource Gantt chart, the displayed content is different depending on where the mouse is pointed to.

If the mouse is pointed to a Use instruction bar, the content is displayed using the [Use instruction status bar text expression] in the Display settings of the Resource Gantt chart.

If the mouse is pointing to a body part of the chart other than an Use instruction bar,

Resource code Start time - End time (resource quantity of Use instruction/resource quantity of working time) is displayed.

Disable Resource / Disable Order

A resource specified as "disabled" is disabled from assignment and appears shaded.

A Use instructions of the order specified as "disabled" appears shaded.


 

Resource Gantt Chart Operations

On the resource Gantt chart, you can not only display scheduling results but also perform various operations such as moving operations, displaying details of tasks, modifying the scheduling results and so on.

 

Selecting a bar

Left-clicking on a Use instruction bar enables you to select the bar. Click here for more information about selecting a Use instruction bar.

 

Resizing bar widths (manually altering use time)

After clicking on a [Use Instruction bar] to select it, the use time of the instruction can be changed with the mouse. Please refer here for more details.

 

Fixing an operation

Moving a use instruction bar automatically fixes its operation.

You can fix, freeze, unfix, or unfreeze an operation on the Gantt chart.

1. Fixing / freezing using the Use instruction bar popup menu

You can fix, freeze, unfix, or unfreeze a task (operation) from the use instruction bar popup menu.

2. Fixing / freezing selected tasks

Executing [Chart] - [Fix] / [Freeze] with one or more tasks selected fixes, freezes, unfixes, or unfreezes these tasks (operations). You can do the same, using tool buttons.

3. Automatically fixing hand-moved operations

Automatically fixes operations moved with the drag and drop feature or moved with the keyboard.

 

Moving an operation

You can move an operation on the Gantt chart using the mouse or keyboard. Click here for more information about selecting a [Use Instruction bar].

 

Menu

On the resource Gantt chart, you can perform various operations from [Chart] in the Menu.

 

Popup menu

Right-clicking the mouse on each area of the resource Gantt chart invokes a corresponding popup menu.

Use Instruction bar Popup Menu

Body Part Popup Menu

Top Part Popup Menu

Column Header Popup Menu

Left Part Popup Menu

Corner Part Popup Menu