Key words
-
Injection pressure
-
Number of molds and the number of cavities
-
Setup time for switching components or molds
-
Bulk production
-
Requirement calculation: scrap and yield
The mold injection manufacturers are faced with various problems and tasks.
- Work instructions are required to consider the number of molds and facilities as well as the injection pressure.
- Plans need to be changed, considering the maintenances or failures of molds.
- Workers need to be correctly assigned based on the changeovers of parts or molds.
- The rate of yield or the number of scraps should be counted to purchase the correct amounts of raw materials.
We will describe how to solve these problems with scheduler.
Video List (30min total) |
|
|||||||||||||||||||||||||||
|
Here if you would like to see on Youtube.
We hold Webinar. Join !