Q: When creating a production schedule can we acquire precise data such as raw material costs and costs for each job and from that data can we see what the costs and key performance indicators (KPI) are going to be?

A"">KPI order KPI and category KPI.

014

One of the special features with KPI in the Advanced Planning and Scheduling System is the calculation of the production order from here on out and of future periods. What happens in sales for the next month in material costs labor costs and profit? What is going to happen with the costs and the profit for this order? Forecasting the future provides the basic data for planning work. The future KPI from the APSS will be calculated based on BOM. The main feature here is that the BOM data used will be the BOM data used in daily production so that a more detailed and precise KPI is calculated.