Key words
-
Switching insulation material
-
Changing the number of laid up wires
-
Setup operators
-
Manufacture/Purchase by lot unit
In the electrical cable manufacturing industry, shortage avoiding and accurate ATP make a big different in sales and profits.
With production scheduler, we can secure proper inventory, shorten lead time and respond to due date quickly.
Besides, we can reflect the operation progress/result to the schedule and inspect the effect by delivery delays in advance resulting from facility failure and production delay so that we can improve the ability to respond promptly.
Moreover, I will show you how to improve the facility operating rate and reduce fixed cost by setup changing time minimization and lot manufacturing.
Video list (Comming soon) |
|
|||||||||||||||||||||||
|
We are holding Webinar. Join !