Q: How do we find out what the results of the production schedule are and what is the schedule for resources (equipment and personnel)?

A: The result of creating the production schedule will display the Gantt resources chart. You can see the schedule for each machine and each employee. It then outputs the work instructions for each machine. If the work is done following these instructions the delivery date displayed in the Gantt order charts will be observed. Each line of the diagram below shows resources. At the left is the resource code. The bars in the center of the chart show the work in each process. A line is drawn between each job. The entire flow of the work connected by vertical lines is the manufacturing order.

007